Another Basement Update
Things are moving along quickly.
The basement "infrastructure" is all in place. The walls are all in their proper places. All of the plumbing is done, including all of the water pipe for a radiant heating system. The electrical work is finished. Conduit and speaker wire has been run for my home theater system. I even built a mount for my projector between two floor joists... twice. (The first one was one joist left of center. OOPS!) Insulation has been placed in the walls and in the ceiling. The basement even passed inspection.
Throughout the whole process of getting the underlying structure in place, I was probably a pretty big pain in the butt for the contractor we hired. I meddled. I complained. I made sure that everything we had discussed was done and was done according to plan. I even replaced two light junction boxes with ones that are rated for ceiling fans because, honestly, it's a LOT easier to do BEFORE the drywall goes up. I figured that if everything wasn't done correctly before the drywall started going up, it wouldn't be corrected at that point. EVER.
Yesterday the drywall people showed up and did a surprising amount of work. The entire ceiling is done and about a third of the walls are done. They're scheduled for seven days of work. I believe that today, they'll finish putting up the sheet rock. Then comes the not-so-fun process of mudding, taping, and sanding. Doors and trim are scheduled for delivery a week from Friday.
The drywall makes everything look smaller. I can no longer see from room to room. Everything feels closer, nearer. I was expecting that to happen.
I'm breathing a bit of a sigh of relief, for now. How bad can you mess up drywall? Well... They've covered up a junction box for a wall sconce light. They pulled two of the four speaker wires through my home theater wall and left the other two buried. No, not really a big deal, because they cut holes for the speakers anyway... But all of this stuff is fixable, at least until they paint. I'm sure I'll be down checking and re-checking, and meddling until it's the way I want it.
We're getting more and more excited. After the drywall people are done and the doors and trim are installed, it'll be time to texture and paint. But starting yesterday, the finished product is becoming more and more visible.